通报号: G/TBT/N/PAK/75 |
ICS号: 91.140.80,91.100.40
|
发布日期: 2015-06-03
|
截至日期: 2015-08-02
|
通报成员: 巴基斯坦
|
目标和理由: 质量要求
|
内容概述: 本巴基斯坦标准规定了建筑用石棉水泥管尺寸、特性和验收测试要求,如与主公用污水管连接的雨水、卫生和污水管。与PS:429和PS:1915一起解读。
|
正文:
世界贸易组织 |
G/TBT/N/PAK/75
2015-06-03
15-2920
|
|
技术性贸易壁垒 |
原文:英语
|
通 报
以下通报根据TBT协定第10.6条分发
1. |
通报成员: 巴基斯坦
如可能,列出涉及的地方政府名称 ( 3.2条和7.2 条):
|
2. |
负责机构:巴基斯坦标准质量管理局(PSQCA)
|
3. |
通报依据条款:2.9.2
|
4. |
覆盖的产品: 建筑和卫生用石棉水泥管PS:2035 (ICS: 91.100.40:91.140.80)
HS编码:68 ICS编码:91.140.80,91.100.40
|
5. |
通报标题: 建筑和卫生用石棉水泥管
语言:英语 页数:10 链接网址:
|
6. |
内容简述: 本巴基斯坦标准规定了建筑用石棉水泥管尺寸、特性和验收测试要求,如与主公用污水管连接的雨水、卫生和污水管。与PS: 429 和 PS: 1915一起解读。
|
7. |
目标与理由:质量要求
|
8. |
相关文件: 巴基斯坦官方公告
|
9. |
拟批准日期:WTO秘书处分发之后90天
拟生效日期:WTO秘书处分发之后90天
|
10. |
意见反馈截止日期: 自通报之日起60天
|
11. |
文本可从以下机构得到:
|
|
正文(英):
NOTIFICATION
The following notification is being circulated in accordance with Article 10.6
1.
|
Notifying Member: Pakistan
If applicable, name of local government involved (Article 3.2 and 7.2):
|
2.
|
Agency responsible:
Pakistan Standards & Quality Control Authority
WTO TBT National Enquiry Point
Block-77, Pak Secretariat
Karachi, Pakistan
Tel.: (+92) 21 99206260, 99261878
Fax: (+92) 21 99206263, 99261877
E-mail: tbt@psqca.com.pk; pqcadg@super.ent.pk
Website: http://www.psqca.com.pk/
Name and address (including telephone and fax numbers, email and website addresses, if available) of agency or authority designated to handle comments regarding the notification shall be indicated if different from above:
|
3.
|
Notified under Article 2.9.2 [X], 2.10.1 [ ], 5.6.2 [ ], 5.7.1 [ ], other:
|
4.
|
Products covered (HS or CCCN where applicable, otherwise national tariff heading. ICS numbers may be provided in addition, where applicable): Asbestos cement pipe fitting for building and sanitary purpose PS:2035 (ICS: 91.100.40:91.140.80)
|
5.
|
Title, number of pages and language(s) of the notified document: Asbestos cement pipe fitting for building and sanitary purpose (10 pages, in English)
|
6.
|
Description of content: This Pakistan Standard specifies the dimensions, characteristics and acceptance tests for asbestos-cement pipe fittings used in building, such as rainwater, sanitary and sewer connections, up to the connection with the main or common sewer. It should be read in conjunction with PS: 429 and PS: 1915.
|
7.
|
Objective and rationale, including the nature of urgent problems where applicable: Quality requirements
|
8.
|
Relevant documents: Government of Pakistan Gazette Notification
|
9.
|
Proposed date of adoption: 90 days after circulation by the WTO Secretariat
Proposed date of entry into force: 90 days after circulation by the WTO Secretariat
|
10.
|
Final date for comments: 60 days from the date of notification
|
11.
|
Texts available from: National enquiry point [X] or address, telephone and fax numbers and email and website addresses, if available, of other body:
Pakistan Standards & Quality Control Authority
WTO TBT National Enquiry Point
Block-77, Pak Secretariat
Karachi, Pakistan
Tel.: (+92) 21 99206260, 99261878
Fax: (+92) 21 99206263, 99261877
E-mail: tbt@psqca.com.pk; pqcadg@super.ent.pk
Website: http://www.psqca.com.pk/
|
|
|
|